Design Activity Plan

    • “Given the design is never finished unless the as-builtsare complete, you may rest assured there are plenty of interim design milestones to define.
Person Using Forklift

PROJECT DEFINITION

Everything necessary to make a conceptual definition from due diligence studies to permit investigations and a basis of design.

Raad More

DESIGN

Picking up the basis of design and developing it to an engineered set of schematics and concept design.

Raad More

PERMITTING

Developing the design to a point in which the bulk of major build permits can be applied, also known as RIBA 3 stage.

Raad More

PROCUREMENT

Detailing the design to a point in which all major procurement can be procured (notwithstanding that which already has been), also known as the RIBA 4 stage.

Raad More

CONSTRUCTION

Taking design to a engineered sets of drawings and submittals, verified with field conditions and ready for fabrication.

Raad More

COMMISIONING

Troubleshooting design and detailing functional strategies and infrastructure optimisations.

Raad More

OPERATIONS

Finishing the design in an easily digestible and structured format for the facility operations team to reference.

Raad More

Our website is under development, We are preparing service offering ready to help you have a professional and agile to suit your needs.